Ellenbrook Secondary College
Hydroptherapy Pool

010 Resized
DSC 0015 2

Ellenbrook Secondary College – Hydrotherapy Pool Selectro was contracted to design, manufacture and install the control panel and associated electrical and instrument installation for the new Ellenbrook Secondary College hydrotherapy pool.

Selectro carried out all design, engineering, site installation, commissioning and documentation in line with the project timeline and within budget.

The HMI layout encompasses a full overview of the plant PID including current and historical process variables, alarms and pop up control elements.

Control system elements of the project include:

  • VSD’s
  • Temperature and heating
  • Flow control
  • PH and Chlorine levels
  • UV sterilisation
  • Alarm monitoring and reporting